| Your
Name* |
|
| Your
Position/Title* |
|
| Your
Company* |
|
| Your
Mailing Address* |
|
| Your
Email* |
|
| Your
Phone Number* |
|
| Best
Time To Call You |
|
| Your
Fax Number |
|
| |
|
| What
type of penetrant do you currently use? (be
specific) |
|
| If
applicable, what type of emulsifier do you
currently use? (be specific) |
|
| Is
your current FPI System manual, semi-automated
or fully automated? |
Manual
Semi-automated
Fully-automated
|
| What
type/method of PWTS do you currently use, if
any? |
|
| Would
the new PWTS replace an existing system? |
Yes
No |
| If
replacing an existing PWTS, what problems did
you have with the old system? |
|
| How
many gallons of effluent are generated per
shift? |
Shifts per Day:
|
| Do
you require the PWTS to be UL and/or CE certified? |
Yes
No |
| Do
you require any gauges to be field calibratable,
NIST certified, analog or digital? |
Yes
No
Please describe:
|
| Available
floor space for PWTS (L x W x H): |
|
| What
is the source of the FPI System's water supply?
(facility, city, river, etc.) |
|
| Do
you have current water supply lab analysis
report? |
Yes
No |
| Do
you have current effluent lab analysis reports? |
Yes
No |
| Is
the PWTS to be manual, semi-automated or fully
automated? |
Manual
Semi-automated
Fully-automated |
| Is
the effluent (treated rinse water) to be re-used
(closed-loop), to facility treatment or municipal
treatment? |
Re-use (closed-loop)
Facility treatment
Municipal treatment |
| If
effluent is going to drain, do you have specific
water quality limits (typically oil & grease,
COD, pH)? |
|
| What
Is Your Desired Delivery Date? |
|
| |
|
| Other
Question / Comments: |
|
| How
did you find this website? |
|
| |
|
|
|